JIANGMEN ZHENLI MACHINERY CO.,LTD
     WeChat
     APP
    mobile
    Site map   |  中文版
   Hot Line:0086-750-7361818 / 7360858
News
Hot chamber die casting machine Cold chamber die casting machine Magnesium alloy die casting machine
中山工作服,中山工衣,中山厂服,中山广告服定制服务, 中山市依索连城服饰有限公司

◆ Contacts:Mr.Li

◆ Mobile:0086-13302590675

◆Tel:0086-750-7361818 / 7360858

◆ Fax:0086-750-7360818

◆ Email:zszhenli@zszhenli.com

◆ Add:No.50 BaoTang Road,Tangxia Town, Jiangmen city ,China

◆ WhatsApp:

+0086 13302590675

◆Wechat:Mr. Gong 13824743116 Mr. Li 13302590675

News
首页 > News

Operation specification for die casting machine

分享:
浏览:444
时间:2017/11/18 11:15:19

[die casting machine] operation standard die casting machine           

4.2 replace the molten cup punch according to the mold condition and adjust the injection and landing structure if necessary.           

4.3 look at the dynamic template to ensure that the surface has no foreign objects and no high points.           

4.4 the correct device sling, in the judgment of the safety situation lifting, and ensure that the mold into the machine before no swing, avoid collision machine tool.           

Die casting operation standard           

4.5 according to the mold status, correctly install the mold. Pay special attention to, with hydraulic core pulling mold, it is necessary to machine tool corresponding to the core pulling condition to "pick", and the core pulling in the dynamic mold, to the "lock mode" before the core; core pulling in the static mold, to the "lock mode" after the plug in the core.           

4.6 press the mould, connect the tubing and cooling water pipe to finish the die set.           

[die casting machine] operation standard die casting machine           

5. mould debugging           

After the 5.1 device is finished, the die is debugged, and the core pulling device is equipped with the core pulling device. It is necessary to pay attention to the debugging when the core is not inserted and the core of the static mould is not in place           

It is forbidden to open the mold when the die is inserted           

When the core pulling of the moving die core pulling device is not in place, the ejection is avoided           

Die casting operation standard           

5.2 it is necessary to debug the ejection stroke first, the rod is not in place, and the plug or die is not necessary.           

5.3 adjust the machine tool opening to select the appropriate clamping force.           

5.4 adjust the pressure injection and follow out stroke, check the cooling water of the punch to ensure no leakage.           

5.5 according to the die casting technology card input technical parameters.

Contact us
AddNo.50 BaoTang Road,Tangxia Town, Jiangmen city ,China
Contact:Mr.Li
Mobile:0086-13302590675
Tel:0086-750-7361818 / 7360858
传真:0086-750-7360818
热室压铸机,冷室压铸机,压铸机厂,锌铝合金压铸机, 江门市振力机械有限公司
Copyright 2017 JIANGMEN ZHENLI MACHINERY CO.,LTD    版权所有   技术支持:网站建设    备案号:粤ICP备17124572号
网站地图  |  网站管理
点击这里给我发消息

Customer

  hotline

Mr. Gong 13824743116(China)

Mr. Li 13302590675 (Ministry of foreign trade)

Service ◀